source link 0421 621 378

Transmission Line Upgrade

As Principal Contractor, NPG Contracting was commissioned to upgrade three strategic high voltage transmission lines with anti-tamper security nuts.

source site With over 746 towers in remote central Queensland, the project required detailed planning and a coordinated logistics effort to ensure safety, quality and execution exceeded the Clients expectation. The project provided NPG Contracting with an opportunity to innovate with tooling used on the project to firstly streamline the process and secondly, create a finish superior in quality. As a result, new tools were engineered from concept design and implemented to provide an effective and safe process for all craft on the project. This showed our Clients our ability to innovate and execute to achieve a win-win outcome for the project. With 6 month project duration, the project was completed on time and budget, with zero safety incidents.

Key Information

order clomid http://ena-musikverlag.de/?p=322 Client
Powerlink Queensland

http://ena-musikverlag.de/?p=418 watch Location
Mackay-Whitsunday Region & Rockhampton, Central Queensland

http://ena-musikverlag.de/?cat=44 cytotec and pregnancy Services Supplied

  • Senior Management
  • On-Site Construction Manager
  • Completion Supervisor
  • QA/QC Inspector
Back To Projects

OTHER PROJECTS

project1

GLNG Upstream Project

here NPG Contracting provided senior management to the EPC contractor including the on-site Construction Manager and also Completion Supervisor and QA/QC inspector services.

buy cytotec in singapore View Project

project2

Hay Point Expansion 3

source link The $3 billion BMA hay Point Coal Port expansion required the development of a new quarry for the 12ha reclamation to extend the seawall and provide additional storm surge protection to the port facility.

follow link View Project

project3

Transmission Line Upgrade

http://esme.es/feed/?attachment_id=3670 As Principal Contractor, NPG Contracting was commissioned to upgrade three strategic high voltage transmission lines with anti-tamper security nuts.

watch View Project

Call NPG Contracting on http://sixfeetfromtheedge.com/wp-content/uploads/2010/10/DSC_0499.jpg 0421 621 378 to discuss how we can help with your project

or

SEND US AN EMAIL

Proud Members Of: