GLNG Upstream Project

NPG contracting was involved in the construction management of The GLNG Upstream project.

go We provided senior management to the EPC contractor including the on-site Construction Manager and  also Completion Supervisor and QA/QC inspector services.  The project involved the construction of a new CSG Compressor Station and Ponds plus associated infrastructure including over 20km of new roads, 3 new quarries for construction materials,  3.4 million cubic metres of earthworks, 15,000m3 of concrete, 300km of electrical cable installation, 280km of piping and associated camps, buildings for operations.  With project involvement over a two year duration, with management of over $1.4b of LNG construction in the heart of the Surat basin, executed by over 800 personnel with over 4.3 million man hours LTI free, NPG Contracting has experience in safe execution of large scale construction in remote locations.

Key Information

source url go site Client
Fluor Australia

enter http://sixfeetfromtheedge.com/tag/nike-air-force-1/ Location
Fairview, Queensland

watch http://mcinstitute.org/100-self-help-examine-knowledge-for-university/ Services Supplied

  • Senior Management
  • On-Site Construction Manager
  • Completion Supervisor
  • QA/QC Inspector
Back To Projects

OTHER PROJECTS

project1

GLNG Upstream Project

http://ena-musikverlag.de/?paged=33 NPG Contracting provided senior management to the EPC contractor including the on-site Construction Manager and also Completion Supervisor and QA/QC inspector services.

http://mcinstitute.org/ojpbsf/rebykudrqxv.php?qxo=lucky-for-life-odds-kansas View Project

project2

Hay Point Expansion 3

source The $3 billion BMA hay Point Coal Port expansion required the development of a new quarry for the 12ha reclamation to extend the seawall and provide additional storm surge protection to the port facility.

http://ww.mcinstitute.org/23mvaqscj/439iuLkzMS974/36333ek.htm View Project

project3

Transmission Line Upgrade

where can i buy cytotec here in the philippines As Principal Contractor, NPG Contracting was commissioned to upgrade three strategic high voltage transmission lines with anti-tamper security nuts.

http://sixfeetfromtheedge.com/2013/05/inspiration-simplicity/1-17/feed/ View Project

Call NPG Contracting on source url 0421 621 378 to discuss how we can help with your project

or

SEND US AN EMAIL

Proud Members Of: